Installation Report
DVIA-M Series
09-08-2017
FEI Apreo HiVac DVIA-MB1000 China trip report (P45) — 2017.09.08
DVIA-M Series
Installation Report
FEI
Apreo HiVac
DVIA-MB1000
MB1000
P45
Tianjin
Tianjin University of Science & Technology
Contents
China business trip report (MB1000_P45 Set up)
| Target equipment | FEI Apreo HiVac |
|---|---|
| Installation site | China, Tianjin |
| Notes | Installed on the first floor of a university research building. |
| END USER | Tianjin University of Science & Technology |
| Trip date | 17.09.05 |
| Operator | 임종욱 |
| Report date | 17.09.08 |
Installation result summary
| Test Direction | Axis | VC-Class (Base) | VC-Class (Top) |
|---|---|---|---|
| ACTIVE | Z | E | G |
| X | E | G | |
| Y | E | G |
Good performance in all directions.
Images good.
MB1000 internal program performance measurement result
Z axis (MB1000 internal program)
X axis (MB1000 internal program)
Y axis (MB1000 internal program)
Vibration environment measurement results
Z axis (Vibration environment)
X axis (Vibration environment)
Y axis (Vibration environment)
SEM images
SEM (Passive)
SEM (Active)
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-08-2017
Tags
DVIA-M Series
Installation Report
FEI
Apreo HiVac
DVIA-MB1000
MB1000
P45
Tianjin
Tianjin University of Science & Technology
Related Case Studies

DVIA-M Series
FEI NOVA450 DVIA-MB1000 (MB1000 P8) installation worksheet — Seoul Hanyang University — 2020-07-14
07-14-2020Read more

DVIA-M Series
FEI SEM DVIA-MB1000 Installation Report — MB1000 P142, SN 190916R4 (2020.06.04)
06-04-2020Read more

DVIA-M Series
Xiamen University FEI QUANTA FEG 650 DVIA-MB1000 (MB1000 P62) Internal program worksheet — 2018-09-17
09-17-2018Read more