Tier-1 Semiconductor Sensofar S neox DVIA-UD350 (P24) Installation Report
November 2020 compact UD350 P24 worksheet at Tier-1 Semiconductor (MLCC measurement lab 3F) with Sensofar S neox: setup photo, VC-Class summary (floor A/E/C vs above active F/G/F), UD350 internal-program Z/X/Y captures, octave-band plots (floor vs above active/stage/head and Z-center/Z1–Z4), and Reference as markdown VC criteria only. Word decorative header (image1) and Generic VC criteria artwork (image6, image7) omitted from publication.

Lemoneyex SN3-4500M Plus UD350 Vibration Measurement Report (2020-10-14)
Vibration measurement worksheet dated 2020-10-14 at Lemoneyex corporate R&D center (4F): UD350 floor vs top-plate VC-Class summary (Z/X/Y), B&K PULSE 14 measurement-equipment photos, and 1/3-octave Floor vs Table VC-Class plots. Generic VC criterion table and VC curve figures from the DOCX reference block are published as the site Reference markdown table only (no separate gallery assets).
Lattice Semiconductor Phils ZEISS EVO 18 DVIA-U1000 (200203R4 · P15) Remote tuning — Philippines — 2020.10.08
DVIA-U1000 serial 200203R4 with ZEISS EVO 18 (project P15) at Aeon Center, Alabang, Philippines via channel partner remote tuning worksheet. Dates of setup and reporting 20.10.08 per form; Measurement date 20.10.08 (Thu). Publication includes onsite equipment photograph plus UB1000/DVIA internal-program Z / X / Y screenshots (transfer-function views) as exported from Word.

Foshan Fozhixin Zeiss SUPRA 25 DVIA-UB1000 (190916R10 · P10) Remote tuning — Internal program plots — 2020.09.10
UB1000 project P10 (series 190916R10): remote tuning worksheet for Zeiss SUPRA 25 at Foshan, END USER Fozhixin. Section order follows the Word file: centred Set up title, installation photograph next (DOCX §2a: rId8 → image1.jpeg), then target/end-user/date tables and overview text; UB1000 internal-program Z/X/Y captures follow matching **Z/X/Y axis** headings. Measurement date 2020-09-10; transmissibility summary reproduced as printed; no standalone Reference appendix in source.

ZEISS EVO10 UB1000 P16 Remote Tuning Installation Report (190923R7, 2020-08-24)
UB1000 (S/N 190923R7, P16 remote tuning worksheet) vibration check after active mounting on ZEISS EVO10 at 高意通讯(深圳)有限公司 6th floor, Shenzhen, delivered. Operator Kim, Doohyun; setup and report 2020-08-24. Publication includes the UB1000 setup photograph, 2/5/10 Hz transmissibility summary (Z/X/Y), and UB1000 internal-program Z/X/Y axis plots.

KIST ZIESS-EXAMINER.A1 UD350 P7 Installation Report (June 2020)
UD350 P7 performance worksheet for KIST (L7 building 2nd floor): ZIESS-EXAMINER.A1, setup June 24, 2020 and reported June 25, 2020 by Hyoung Mun Choi (DAEIL SYSTEMS). B&K PULSE 14 / LAN-XI Type 3056 and PCB 393B05 accelerometer (0.7–200 Hz). VC-Class summary (Floor vs Above Active) and UD350 internal-program Z/X/Y screenshots plus octave-band Floor vs Above Active plots. Decorative title-block raster (image1) and inline summary-table embeds (image2–4) omitted from publication.