Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

Filtered Case Studies

184 case studies
Foshan Fozhixin Zeiss SUPRA 25 DVIA-UB1000 (190916R10 · P10) Remote tuning — Internal program plots — 2020.09.10

UB1000 project P10 (series 190916R10): remote tuning worksheet for Zeiss SUPRA 25 at Foshan, END USER Fozhixin. Section order follows the Word file: centred Set up title, installation photograph next (DOCX §2a: rId8 → image1.jpeg), then target/end-user/date tables and overview text; UB1000 internal-program Z/X/Y captures follow matching **Z/X/Y axis** headings. Measurement date 2020-09-10; transmissibility summary reproduced as printed; no standalone Reference appendix in source.

ZEISS EVO10 UB1000 P16 Remote Tuning Installation Report (190923R7, 2020-08-24)

UB1000 (S/N 190923R7, P16 remote tuning worksheet) vibration check after active mounting on ZEISS EVO10 at 高意通讯(深圳)有限公司 6th floor, Shenzhen, delivered. Operator Kim, Doohyun; setup and report 2020-08-24. Publication includes the UB1000 setup photograph, 2/5/10 Hz transmissibility summary (Z/X/Y), and UB1000 internal-program Z/X/Y axis plots.

KIST ZIESS-EXAMINER.A1 UD350 P7 Installation Report (June 2020)
Installation Report
DVIA-ULF Series
06-25-2020

KIST ZIESS-EXAMINER.A1 UD350 P7 Installation Report (June 2020)

UD350 P7 performance worksheet for KIST (L7 building 2nd floor): ZIESS-EXAMINER.A1, setup June 24, 2020 and reported June 25, 2020 by Hyoung Mun Choi (DAEIL SYSTEMS). B&K PULSE 14 / LAN-XI Type 3056 and PCB 393B05 accelerometer (0.7–200 Hz). VC-Class summary (Floor vs Above Active) and UD350 internal-program Z/X/Y screenshots plus octave-band Floor vs Above Active plots. Decorative title-block raster (image1) and inline summary-table embeds (image2–4) omitted from publication.

Institute for Basic Science 2F Analysis Lab DVIA-UD350 P16 Installation Report

December 2019 compact worksheet after DVIA-UD350 isolation (project P16) at Institute for Basic Science 2F analysis laboratory: site checklist, trip and report dates, VC-Class summary (general test condition: floor B/B/D vs platform E/E/E), U350 internal-program Z/X/Y captures, and octave-band floor vs isolator-top plots. Target equipment listed as Unknown in the source worksheet. Word header decoration (image1) omitted from publication; Reference uses the standard markdown criteria table only.

Institute for Basic Science 2F Analysis Lab NIKON ECLIPSE DVIA-UD350 P9 Installation Report

December 2019 compact worksheet after DVIA-UD350 isolation (project P9) for NIKON ECLIPSE at Institute for Basic Science 2F analysis laboratory: site checklist, trip and report dates, VC-Class summary (general test condition: floor D/E/E vs platform G/G/G), U350 internal-program Z/X/Y captures, and octave-band floor vs isolator-top plots. Overview lists equipment model UNKNOWN in the source worksheet. Word header decoration (image1) omitted from publication; Reference uses the standard markdown criteria table only.

Institute for Basic Science NIKON ECLIPSE DVIA-UD350 (P14) Performance Report

June 2019 performance worksheet (report 2019-06-11): NIKON_ECLIPSE at Institute for Basic Science 2F analysis lab on DVIA-UD350 (P14). VC-Class summary (floor vs isolation tabletop), UD350 internal-program Z/X/Y captures, and octave-band floor vs tabletop plots. Word decorative header bitmap (image1) omitted from publication; Reference uses the standard VC criteria markdown table only.