Installation Report
DVIA-ML Series
12-03-2018
Tier-1 Semiconductor STM (Omicron) MC3000_P7 vibration worksheet — 2018.12.03
DVIA-ML Series
Installation Report
Tier-1 Semiconductor
STM
Omicron
MC3000_P7
Contents
MAIN YANG MC3000_P7 Set up
Installation and measurement worksheet
| Field | Value |
|---|---|
| Target equipment | STM (Omicron) |
| Place of installation | Secret Place, 1th FLOOR |
| Uniqueness | Good Performance |
| END USER | Secret |
Date of business trip : 18.11.30
Business traveler: Choi, HyoungMun
Date Created : 18.12.03
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 2018.11.30 (Friday),
Rater: Daeil System, Manager Choi , Hyoung Moon
Place of measurement : Secret Place, 1th FLOOR
Equipment Model: STM (Omicron)
Measurement conditions and results
Summary of measurement results
Good omnidirectional performance and attached VC-Class graph.
MC3000 internal program performance measurement result
Z axis
X axis
Y axis
Octave Band Result
(BASE: Floor, TOP: Above Active)
Z axis
X axis
Y axis
ACCELLATION SPECTRUM
(BASE: Floor, TOP: Above Active)
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ML Series
Date12-03-2018
Tags
DVIA-ML Series
Installation Report
Tier-1 Semiconductor
STM
Omicron
MC3000_P7
Related Case Studies
DVIA-ML Series
Tier-1 Semiconductor Cheonan C5 ZEISS Versa Xradia 630 Versa DVIA-ML3000 (250917R1) Installation Report
01-06-2026Read more
DVIA-ML Series
Tier-1 Semiconductor Raith Voyager Installation Report
10-13-2025Read more

DVIA-ML Series
Tier-1 Semiconductor Thermo Fisher Scientific S/TEM Spectra 300 DVIA-ML3000 (241119R1) Installation Report
09-15-2025Read more