Skip to main content
Installation Report
DVIA-ML Series
12-03-2018

Tier-1 Semiconductor STM (Omicron) MC3000_P7 vibration worksheet — 2018.12.03

DVIA-ML Series
Installation Report
Tier-1 Semiconductor
STM
Omicron
MC3000_P7

MAIN YANG MC3000_P7 Set up

Installation and measurement worksheet

FieldValue
Target equipmentSTM (Omicron)
Place of installationSecret Place, 1th FLOOR
UniquenessGood Performance
END USERSecret

Date of business trip : 18.11.30

Business traveler: Choi, HyoungMun

Date Created : 18.12.03

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 2018.11.30 (Friday),

Rater: Daeil System, Manager Choi , Hyoung Moon

Place of measurement : Secret Place, 1th FLOOR

Equipment Model: STM (Omicron)

Measurement conditions and results

Summary of measurement results

Good omnidirectional performance and attached VC-Class graph.

MC3000 internal program performance measurement result

Z axis

X axis

Y axis

Octave Band Result

(BASE: Floor, TOP: Above Active)

Z axis

X axis

Y axis

ACCELLATION SPECTRUM

(BASE: Floor, TOP: Above Active)

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ML Series
Date12-03-2018
Tags
DVIA-ML Series
Installation Report
Tier-1 Semiconductor
STM
Omicron
MC3000_P7