Skip to main content
Installation Report
DVIA-M Series
10-20-2021

Tier-1 Semiconductor MAIN YANG MB3000_P7 Omicron STM worksheet — setup 2021.10.20

DVIA-M Series
Installation Report
Tier-1 Semiconductor
Omicron
STM
DVIA-MB3000
MB3000 P7

Worksheet

MAIN YANG MB3000_P7 Set up

Target equipment: STM (Omicron)

Place of installation: Secret Place, 1th FLOOR

Uniqueness: Good Performance

END USER: Secret

Operator · setup · reporting

Operator: Choi, HyoungMun Date of setup: 21.10.20 Date of reporting: 21.10.22

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

2021.10.20 (WED),

Rater

Daeil System, Manager Choi, Hyoung Moon

Place of measurement

Secret Place, 1th FLOOR

Equipment Model

STM (Omicron)

Measurement conditions and results

Summary of measurement results

Test Condition2 Hz5 Hz10 Hz
Z-23 dB-25 dB-22 dB
X-25 dB-28 dB-27 dB
Y-33 dB-25 dB-27 dB

Good omnidirectional performance and attached VC-Class graph.

MB3000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-20-2021
Tags
DVIA-M Series
Installation Report
Tier-1 Semiconductor
Omicron
STM
DVIA-MB3000
MB3000 P7