Installation Report
DVIA-M Series
10-20-2021
Tier-1 Semiconductor MAIN YANG MB3000_P7 Omicron STM worksheet — setup 2021.10.20
DVIA-M Series
Installation Report
Tier-1 Semiconductor
Omicron
STM
DVIA-MB3000
MB3000 P7
Contents
Worksheet
MAIN YANG MB3000_P7 Set up
Target equipment: STM (Omicron)
Place of installation: Secret Place, 1th FLOOR
Uniqueness: Good Performance
END USER: Secret
Operator · setup · reporting
Operator: Choi, HyoungMun Date of setup: 21.10.20 Date of reporting: 21.10.22
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
2021.10.20 (WED),
Rater
Daeil System, Manager Choi, Hyoung Moon
Place of measurement
Secret Place, 1th FLOOR
Equipment Model
STM (Omicron)
Measurement conditions and results
Summary of measurement results
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -23 dB | -25 dB | -22 dB |
| X | -25 dB | -28 dB | -27 dB |
| Y | -33 dB | -25 dB | -27 dB |
Good omnidirectional performance and attached VC-Class graph.
MB3000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date10-20-2021
Tags
DVIA-M Series
Installation Report
Tier-1 Semiconductor
Omicron
STM
DVIA-MB3000
MB3000 P7
Related Case Studies

DVIA-M Series
YIMO Omicron STM DVIA-M1000 (2309050R3) Installation Report — Beijing Academy of Quantum Information Sciences
01-23-2026Read more

DVIA-M Series
Beijing Academy of Quantum Information Sciences Omicron STM DVIA-M1000 / M1000F (230905R3) Installation Report
08-18-2025Read more
DVIA-M Series
Tier-1 Semiconductor ZEISS Versa 620 X-ray Microscope DVIA-MB3000 (170515R4) Installation Report — 2025.07.08
07-08-2025Read more