Skip to main content
Installation Report
DVIA-M Series
08-03-2023

Tianjin Zhuosheng Scios2 DVIA-M1000 (230626R1) Installation Report

DVIA-M Series
Installation Report
Tianjin Zhuosheng
DVIA-M1000
230626R1
Scios2
Tianjin

Tianjin Zhuosheng precision Machinery Technology Co., LTD

Tianjin Zhuosheng precision Machinery Technology Co., LTD

(M1000_ 230626R1 Set up)

Site checklist

Target equipmentNONE
Place of installationTianjin
RemarkGood Performance
END USERTianjin Zhuosheng precision Machinery Technology Co., LTD

Operator and dates

Operator: Lee, Young Ha

Date of setup: 23.07.28

Date of reporting: 23.08.03

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.07.28 (Friday)

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Tianjin

Equipment Model: Scios2(Before installation)

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date08-03-2023
Tags
DVIA-M Series
Installation Report
Tianjin Zhuosheng
DVIA-M1000
230626R1
Scios2
Tianjin