Skip to main content
Installation Report
DVIA-M Series
07-06-2024

Custom Equipment STM DVIA-MO1000 (230608R2) Installation Report

DVIA-M Series
Installation Report
STM
Custom Equipment
DVIA-MO1000
230608R2

MO1000_230608R2 Set Up Report

Site checklist

Target equipmentSTM
Place of installationN/A
RemarkGood Performance
END USERN/A

Operator and dates

Operator: Byeonghun Cho

Date of setup: 24.07.01

Date of reporting: 24.07.06

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-MO1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.07.01(Monday)

Operator: Byeonghun Cho from DAEIL SYSTEMS

Place of measurement: N / A

Equipment Model:

Manufacturer: Custom Equipment

Equipment: STM

5.

MB1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-06-2024
Tags
DVIA-M Series
Installation Report
STM
Custom Equipment
DVIA-MO1000
230608R2