Skip to main content
Installation Report
DVIA-M Series
07-24-2023

PXW TESCAN SOLARIS GMH DVIA-M1000 (230501R3-4) Installation Report

DVIA-M Series
Installation Report
PXW
DVIA-M1000
230501R3-4
TESCAN
SOLARIS GMH
Shenzhen

PXW

PXW

(M1000_ 230501R3-4 Set up)

Site checklist

Target equipmentTESCAN SOLARIS GMH
Place of installationShenzhen
RemarkGood Performance
END USERPXW

Operator and dates

Operator: Lee, Young Ha

Date of setup: 23.07.21

Date of reporting: 23.07.24

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.07.21 (Friday)

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Shenzhen

Equipment Model: TESCAN SOLARIS GMH

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-24-2023
Tags
DVIA-M Series
Installation Report
PXW
DVIA-M1000
230501R3-4
TESCAN
SOLARIS GMH
Shenzhen