Installation Report
DVIA-M Series
07-24-2023
PXW ZEISS Crossbeam 550 DVIA-M1000 (230324R4) Installation Report
DVIA-M Series
Installation Report
PXW
DVIA-M1000
230324R4
ZEISS
Crossbeam 550
Shenzhen
Contents
PXW
PXW
(M1000_ 230324R4 Set up)
Site checklist
| Target equipment | Crossbeam550 |
|---|---|
| Place of installation | Shenzhen |
| Remark | Good Performance |
| END USER | PXW |
Operator and dates
Operator: Lee, Young Ha
Date of setup: 23.07.20
Date of reporting: 23.07.24
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.07.20 (Thursday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Shenzhen
Equipment Model: Crossbeam550
5.
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-24-2023
Tags
DVIA-M Series
Installation Report
PXW
DVIA-M1000
230324R4
ZEISS
Crossbeam 550
Shenzhen