Installation Report
DVIA-M Series
05-29-2023
SU8600 DVIA-M1000 Installation Report (221118R1, Yixing)
DVIA-M Series
Installation Report
SU8600
SEM
DVIA-M1000
Yixing
Jiangsu Shekoy Semiconductor
Contents
Overview
Target equipment: SU8600
Place of installation: Yixing
Remark: Good Performance
END USER: Jiangsu Shekoy Semiconductor New Materical Co., Ltd.
Operator: Yu, Ho Sang
Date of setup: 23.05.26
Date of reporting: 23.05.29
Date of business trip : 17.12.27~17.12.29
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.05.26 (Friday)
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement: Yixing
Equipment Model: SU8600
5.
(M1000_ 221118R1 Set up)
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-29-2023
Tags
DVIA-M Series
Installation Report
SU8600
SEM
DVIA-M1000
Yixing
Jiangsu Shekoy Semiconductor
Related Case Studies

DVIA-M Series
SU8600 SEM DVIA-M1000 Internal Program Performance Report — Wenzhou Medical University (Zhejiang, 2023)
05-22-2023Read more

DVIA-M Series
Hitachi SU8600 SEM DVIA-M1000 Internal Program Performance Report — ZEEKR (Shenzhen, 2022)
11-29-2022Read more

DVIA-M Series
Chinese Academy of Sciences — Institute of Metal Research ZEISS GeminiSEM360 DVIA-M1000 (230328R2) Installation Report
05-15-2026Read more