Installation Report
DVIA-M Series
10-26-2023
Suzhou Sko Semiconductor Sigma 300 DVIA-M1000 (221108R1) Internal Program Performance — 2023.10.26
DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1
Contents
(M1000_ 221108R1 Set up)
| Target equipment | Sigma 300 |
|---|---|
| Place of installation | Suzhou |
| Remark | Good Performance |
| END USER | Suzhou Sko Semiconductor Co., Ltd. |
| Operator: Park, Jongwon | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 23.10.26 | |
| Date of reporting: 23.10.26 |
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.10.26 (Thursday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Suzhou
Equipment Model: Sigma 300
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date10-26-2023
Tags
DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1
Related Case Studies

DVIA-M Series
YIMOTECH Thermo Fisher Scientific Helios 5CX FIB-SEM DVIA-M1000 Installation Report
07-02-2026Read more

DVIA-M Series
Suzhou Xiangcheng Enterprise Technology Hitachi SU8600 FE-SEM DVIA-M1000 (240304R7) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Zeiss Technology (Suzhou) ZEISS EVO 10 SEM DVIA-M1000 (240304R8) Installation Report
11-11-2025Read more