Installation Report
DVIA-M Series
10-26-2023

Suzhou Sko Semiconductor Sigma 300 DVIA-M1000 (221108R1) Internal Program Performance — 2023.10.26

DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1

(M1000_ 221108R1 Set up)

Target equipmentSigma 300
Place of installationSuzhou
RemarkGood Performance
END USERSuzhou Sko Semiconductor Co., Ltd.
Operator: Park, JongwonDate of business trip : 17.12.27~17.12.29
Date of setup: 23.10.26
Date of reporting: 23.10.26

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.10.26 (Thursday)

Operator: DAEIL SYSTEMS Jongwon Park

Place of measurement: Suzhou

Equipment Model: Sigma 300

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-26-2023
Tags
DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1