Skip to main content
Installation Report
DVIA-P Series
05-19-2023

Tan Kah Kee Innovation Laboratory Bonder DVIA-P7000 (221018R3) Installation Report

DVIA-P Series
Installation Report
Tan Kah Kee Innovation Laboratory
DVIA-P7000
221018R3
Bonder
Xiamen

Tan Kah Kee Innovation Laboratory (P7000_221018R3 Set up)

Site checklist

Target equipmentBonder
Place of installationXIAMEN
RemarkGood Performance
END USERTAN KAH KEE INNOVATION LABORATORY

Operator and dates

Operator: Lee, Young Ha

Date of setup: 23.05.17

Date of reporting: 23.05.19

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-P7000 active vibration isolation platform is appropriately installed and functioning as intended. (prior to equipment installation).

Measurement date

Measurement date: 2023.05.17 (Wednesday)

Operator

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement

Place of measurement: XIAMEN

Equipment Model

Equipment Model: Bonder

Measurement conditions and results

Summary of measurement results

Equipment is turned off

Test ConditionVC Curves Z-axisVC Curves X-axisVC Curves Y-axis
FloorDDC
ActiveFGE

Equipment is turned on

Test ConditionVC Curves Z-axisVC Curves X-axisVC Curves Y-axis
FloorDDD
ActiveDDD

Good omnidirectional performance.

P7000 internal program performance measurement result

(Equipment turn off)

P7000 internal program — Z axis

P7000 internal program — X axis

P7000 internal program — Y axis

Octave Band Result

Equipment is turned off.

Octave Band Result — Equipment off — Z axis

Octave Band Result — Equipment off — X axis

Octave Band Result — Equipment off — Y axis

Equipment is turned on

Equipment on — Z axis

Equipment on — X axis

Equipment on — Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-P Series
Date05-19-2023
Tags
DVIA-P Series
Installation Report
Tan Kah Kee Innovation Laboratory
DVIA-P7000
221018R3
Bonder
Xiamen