Skip to main content
Installation Report
DVIA-M Series
02-06-2023

Oxford University Suzhou Sigma300 DVIA-M1000 (220817R2) Installation Report

DVIA-M Series
Installation Report
Oxford Suzhou
Suzhou
Sigma300
DVIA-M1000
220817R2

Equipment installation photograph

Target equipmentSigma300
Place of installationSUZHOU
RemarkGood Performance
END USEROxford University (Suzhou) Technology Co., Ltd

Operator: Yu, Ho Sang

Date of setup: 23.02.02

Date of reporting: 23.02.06

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

Measurement date: 2023.02.02 (Thursday),

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement: SUZHOU

Equipment Model: Sigma300

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date02-06-2023
Tags
DVIA-M Series
Installation Report
Oxford Suzhou
Suzhou
Sigma300
DVIA-M1000
220817R2