Installation Report
DVIA-M Series
12-27-2022
Shanghai Shumin Xi’an Interferometer DVIA-MO1000 (220707R7) Installation Report — December 27, 2022
DVIA-M Series
Installation Report
Shanghai Shumin
Xi'an
Interferometer
DVIA-MO1000
Contents
Prepared for
Shanghai Shumin Equipment Co., Ltd.
Report written date
22.12.27
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-MO1000 active vibration isolation platform is appropriately installed and functioning as intended.
System Information
Model: DVIA-MO1000
Serial Number: 220707R7
Engineer
Youngha Lee from DAEIL SYSTEMS
Tuning Date
December 09, 2022
Location
Xi'an
Equipment
interferometer
Data and Image
Z-axis (Vertical) Transmissibility Graph
X-axis (Left to Right) Transmissibility Graph
Y-axis (Front to Back) Transmissibility Graph
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-27-2022
Tags
DVIA-M Series
Installation Report
Shanghai Shumin
Xi'an
Interferometer
DVIA-MO1000
Related Case Studies

DVIA-M Series
Fudan University STM DVIA-MO1000 (221114R2) Installation Report
05-16-2026Read more

DVIA-M Series
Guangzhou Kingmed Sigma300 DVIA-M1000 (230401R1) Installation Report
05-15-2026Read more

DVIA-M Series
Lee Tsung-Dao Research Institute STM DVIA-MO1000 (230608R2) Set Up Report
05-15-2026Read more