Installation Report
DVIA-M Series
08-16-2023
Gemini 360 DVIA-M1000 Internal Performance Report (Shenzhen, 2023)
DVIA-M Series
Installation Report
Shenzhen
Gemini 360
DVIA-M1000
220603R4
ZEISS
Contents
Overview
Report title line: (M1000_ 220603R4 Set up)
Target equipment: Gemini 360
Place of installation: Shenzhen
Remark: Good Performance
END USER: Shenzhen Instituteof Special Equipment Inspection and Test
Operator: Lee, Youngha
Date of setup: 23.08.09
Date of reporting: 23.08.16
Date of business trip: 17.12.27~17.12.29
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.08.09 (Wednesday)
Operator: DAEIL SYSTEMS Youngha Lee
Place of measurement: Shenzhen
Equipment Model: Gemini 360
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date08-16-2023
Tags
DVIA-M Series
Installation Report
Shenzhen
Gemini 360
DVIA-M1000
220603R4
ZEISS
Related Case Studies

DVIA-M Series
PXW ZEISS GeminiSEM560 DVIA-M1000 (230525R8) Installation Report
05-15-2026Read more

DVIA-M Series
ZEISS GeminiSEM 360 DVIA-M1000 Internal Performance Report (220603R4, 2024-07-05)
07-05-2024Read more

DVIA-M Series
PXW ZEISS Crossbeam 550 DVIA-M1000 (230324R4) Installation Report
07-24-2023Read more