China Electric Power Research Institute Sigma500 DVIA-U1000 (220512R4) Installation Report — Beijing

DVIA-U Series
Installation Report
China Electric Power Research Institute
CEPRI
Sigma500
Beijing
DVIA-U1000
220512R4

CHINA ELECTRIC POWER RESEARCH INSTITUTE

CHINA ELECTRIC POWER RESEARCH INSTITUTE

(U1000_ 220512R4 Set up)

Site checklist

Target equipmentSigma500
Place of installationBeijing
RemarkGood Performance
END USERCHINA ELECTRIC POWER RESEARCH INSTITUTE

Operator and dates

Operator: Lee, Youngha Date of setup: 23.01.31 Date of reporting: 23.01.31Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.01.31 (Tuesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: Beijing, China Equipment Model: Sigma500

U1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date01-31-2023
Tags
DVIA-U Series
Installation Report
China Electric Power Research Institute
CEPRI
Sigma500
Beijing
DVIA-U1000
220512R4