Installation Report
DVIA-ULF Series
07-21-2022
GRINM Zeiss EVO15 DVIA-U1000 (220603R1) Installation Report — Beijing
DVIA-U Series
Installation Report
GRINM
Beijing
Zeiss
EVO15
DVIA-U1000
220603R1
Contents
GRINM Resources and Environment Tech. Co., Ltd.(北京有色金属研究院)
GRINM Resources and Environment Tech. Co., Ltd.(北京有色金属研究院)
(U1000_ 220603R1 Set up)
Site checklist
| Target equipment | Zeiss EVO15 |
|---|---|
| Place of installation | BEIJING |
| Remark | Good Performance |
| END USER | GRINM Resources and Environment Tech. Co., Ltd.(北京有色金属研究院) |
Operator and dates
| Operator: Lee, Youngha Date of setup : 22.07.20 Date of reporting : 22.07.21 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
Overview The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2022.07.20 (Wednesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: BEIJING, China Equipment Model: Zeiss EVO15 Measurement conditions and results Summary of measurement results Good omnidirectional performance.
UB1000 internal program performance measurement result
Z axis
X axis
Y axis
Octave Band Result
Z axis (octave band)
X axis (octave band)
Y axis (octave band)
Active Off
Active On
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date07-21-2022
Tags
DVIA-U Series
Installation Report
GRINM
Beijing
Zeiss
EVO15
DVIA-U1000
220603R1
Related Case Studies

DVIA-ULF Series
GRINM Zeiss EVO15 DVIA-UB700 (220603R1) Installation Report
07-21-2022Read more

DVIA-ULF Series
Shanghai Shengjian Environmental System Technology Sigma300 DVIA-U1000 (220919R7) Installation Report — Shanghai
03-10-2023Read more

DVIA-ULF Series
China Electric Power Research Institute Sigma500 DVIA-U1000 (220512R4) Installation Report — Beijing
01-31-2023Read more