(U1000_ 230512R4 Set up)

Site checklist

Target equipmentSigma500
Place of installationCHENGDU
RemarkGood Performance
END USERDongFang Boiler (Group) Co., Ltd.

Operator and dates

Operator: Lee, Youngha Date of setup: 23.07.05Date of reporting: 23.07.06Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.07.05 (Wednesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: CHENGDU, China

Equipment Model: Sigma500

U1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date07-06-2023
Tags
DVIA-U Series
Installation Report
DongFang Boiler
Sigma500
Chengdu
DVIA-U1000
230512R4