Skip to main content
Installation Report
DVIA-M Series
12-13-2022

BTRCHINA GeminiSEM 460 DVIA-M1000 (220422R1) Internal Program Performance — Shenzhen — 2022.12.13

DVIA-M Series
Installation Report
BTRCHINA
GeminiSEM 460
Shenzhen
DVIA-M1000
220422R1

(M1000_ 220422R1 Set up)

Target equipmentGeminiSEM460
Place of installationSHENZHEN
RemarkGood Performance
END USERBTRCHINA
Operator: Lee, Young HaDate of business trip : 17.12.27~17.12.29
Date of setup: 22.12.13
Date of reporting: 22.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.12.13 (Tuesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: SHENZHEN

Equipment Model: GeminiSEM460

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-13-2022
Tags
DVIA-M Series
Installation Report
BTRCHINA
GeminiSEM 460
Shenzhen
DVIA-M1000
220422R1