Installation Report
DVIA-M Series
08-01-2022
Shanghai University ZEISS GEMINI300 DVIA-M1000 (220411R2) Installation Report
DVIA-M Series
Installation Report
Shanghai University
ZEISS
GEMINI300
Shanghai
DVIA-M1000
220411R2
Contents
Shanghai University(上海大学)
(M1000_ 220411R2 Set up)
Site checklist
| Target equipment | ZEISS GEMINI300 |
|---|---|
| Place of installation | SHANGHAI |
| Remark | Good Performance |
| END USER | Shanghai University(上海大学) |
Operator and dates
Operator: Lee, Young ha
Date of setup: 22.07.28
Date of reporting: 22.08.01
Date of business trip : 17.12.27~17.12.29
Overview
Overview The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.07.28 (Thursday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: SHANGHAI
Equipment Model: ZEISS GEMINI300
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date08-01-2022
Tags
DVIA-M Series
Installation Report
Shanghai University
ZEISS
GEMINI300
Shanghai
DVIA-M1000
220411R2
Related Case Studies

DVIA-M Series
ZEISS Innovation Center Sigma 360 VP DVIA-M1000 Installation Report (YIMO, Shanghai, 2025-07-03)
07-03-2025Read more

DVIA-M Series
ZEISS DEMO Laboratory Sigma 360 VP DVIA-M1000 Installation Report (Shanghai)
04-29-2025Read more

DVIA-M Series
ZEISS Innovation Center ZEISS Sigma 360 VP DVIA-M1000 (220121R3) Internal Program Performance — 2025.01.10
01-10-2025Read more