Installation Report
DVIA-M Series
04-29-2025
ZEISS DEMO Laboratory Sigma 360 VP DVIA-M1000 Installation Report (Shanghai)
DVIA-M Series
Installation Report
ZEISS
ZEISS DEMO Laboratory
Sigma 360 VP
DVIA-M1000
Shanghai
Contents
Installation details
Target equipment: ZEISS Sigma 360 VP
Place of installation: Shanghai
Remark: Good Performance
End user: ZEISS DEMO Laboratory
Reporting schedule
Operator: Chaewon Lee
Date of setup: 25.04.28
Date of reporting: 25.04.29
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2025.04.28(Monday)
Vibration Isolation System Information
Model: DVIA-M1000
Serial Number: 220121R3
Operator
Chaewon Lee from DAEIL SYSTEMS
Place of measurement
Shanghai
End user
ZEISS DEMO Laboratory
Equipment
Manufacturer: ZEISS
Equipment: FE-SEM
Model: Sigma 360 VP
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-29-2025
Tags
DVIA-M Series
Installation Report
ZEISS
ZEISS DEMO Laboratory
Sigma 360 VP
DVIA-M1000
Shanghai
Related Case Studies

DVIA-M Series
ZEISS Innovation Center Sigma 360 VP DVIA-M1000 Installation Report (YIMO, Shanghai, 2025-07-03)
07-03-2025Read more

DVIA-M Series
ZEISS Innovation Center ZEISS Sigma 360 VP DVIA-M1000 (220121R3) Internal Program Performance — 2025.01.10
01-10-2025Read more

DVIA-M Series
Integrated Service Technology ZEISS Gemini 560 DVIA-M1000 (230927R4) Setup — Shanghai
12-19-2023Read more