Installation Report
DVIA-M Series
04-19-2023
Sun Yat-sen University Hitachi SU8010 DVIA-M1000 (220126R7-3) Installation Report
DVIA-M Series
Installation Report
Sun Yat-sen University
Guangdong
Hitachi
SU8010
DVIA-M1000
220126R7-3
Contents
(M1000_ 220126R7-1 Set up)
Site checklist
| Target equipment | HITACHI SU8010 |
|---|---|
| Place of installation | GUANGDONG |
| Remark | Good Performance |
| END USER | SUN YAT-SEN UNIVERSITY |
Operator and dates
Operator: Lee, Young Ha
Date of setup: 23.04.13
Date of reporting: 23.04.19
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.04.12 (Wednesday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: GUANGDONG
Equipment Model: HITACHI SU8010
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-19-2023
Tags
DVIA-M Series
Installation Report
Sun Yat-sen University
Guangdong
Hitachi
SU8010
DVIA-M1000
220126R7-3
Related Case Studies

DVIA-M Series
Hitachi SU8010 (Sun Yat-sen University) DVIA-M1000 Installation Report
04-19-2023Read more

DVIA-M Series
Guangdong Institute for Drug Control Hitachi Regulus 8100 DVIA-M1000 (210415R1) Internal Program — 2021.06.22
06-22-2021Read more

DVIA-M Series
YIMO Hitachi TEM HT7800 DVIA-M1000 (240927R2-1) Installation Report
08-19-2025Read more