Skip to main content
Installation Report
DVIA-M Series
06-22-2021

Guangdong Institute for Drug Control Hitachi Regulus 8100 DVIA-M1000 (210415R1) Internal Program — 2021.06.22

DVIA-M Series
Installation Report
YIMO
Guangdong
DVIA-M1000
210415R1
Hitachi
Regulus 8100
Guangdong Institute for Drug Control

(MB1000 210415R1 (P225) Set up)

Target equipmentHitachi Regulus 8100
Place of installationGuangdong Institute For Drug Control
RemarkGood Performance
END USERGuangdong Institute For Drug Control
Operator: Doohyun KimDate of business trip : 17.12.27~17.12.29
Date of setup: 21.06.22
Date of reporting: 21.06.22

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 21. 06. 22. (TUE)

Operator: Daeil System, Research engineer Doohyun Kim

Place of measurement: Guangdong Institute For Drug Control

Equipment Model: Hitachi Regulus 8100

Measurement conditions and results

Summary of measurement results

2 Hz5 Hz10 Hz
Z-24 dB-30 dB-30 dB
X-21 dB-32 dB-35 dB
Y-29 dB-34 dB-34 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-22-2021
Tags
DVIA-M Series
Installation Report
YIMO
Guangdong
DVIA-M1000
210415R1
Hitachi
Regulus 8100
Guangdong Institute for Drug Control