Skip to main content
Installation Report
DVIA-M Series
04-13-2022

Guangdong Xiandao ZEISS Sigma 300 DVIA-M1000 Installation Worksheet (2022-04-13)

DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Sigma 300
Guangdong Xiandao
Qingyuan
MB1000

Guangdong Xiandao

Guangdong Xiandao

(MB1000_ 220107R1 Set up)

Target equipment

ZEISS Sigma300

Place of installation

Qingyuan, Guangdong Xiandao

Remark

Good Performance

END USER

Guangdong Xiandao

Operator

Lee, Young Ha

Date of setup

22.04.06

Date of reporting

22.04.13

Date of business trip

17.12.27~17.12.29

Vibration isolation system information

Model: DVIA-M1000

Serial number: 220107R1

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.04.06 (Wednesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Guangdong Xiandao

Equipment Model: Zeiss Sigma300

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date04-13-2022
Tags
DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Sigma 300
Guangdong Xiandao
Qingyuan
MB1000