Installation Report
DVIA-M Series
09-05-2022
Shanghai University Thermoscientific apreos 2s DVIA-M1000 (SN 220106R8) Installation Report
DVIA-M Series
Installation Report
Shanghai University
Guangzhou
Thermo Scientific
DVIA-M1000
220106R8
Contents
Operator
Lee, Young Ha
Date of setup
22.08.29
Date of reporting
22.09.05
Date of business trip
17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2022.08.29 (Thursday),
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement
Guangzhou
Equipment Model
Thermoscientific apreos 2s
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-05-2022
Tags
DVIA-M Series
Installation Report
Shanghai University
Guangzhou
Thermo Scientific
DVIA-M1000
220106R8
Related Case Studies

DVIA-M Series
Hitachi SU8230 DVIA-M1000 Installation Report — Shanghai University / Guangzhou (2022-08-24)
08-24-2022Read more

DVIA-M Series
Guangzhou Govisionox Helios 5 PFIB CXe DVIA-M1000 (230904R1) Installation Report
12-28-2023Read more
DVIA-M Series
Institute of Semiconductors (CAS) Helios G5 Langfang DVIA-M1000 Installation Report
02-06-2023Read more