Installation Report
DVIA-M Series
10-27-2022
RUFENG CHEM Sigma300 DVIA-M1000 (211216R7) — Shandong
DVIA-M Series
Installation Report
RUFENG CHEM
Sigma300
Shandong
DVIA-M1000
211216R7
ZEISS
Contents
(M1000_ 211216R7 Set up)
| Target equipment | Sigma300 |
|---|---|
| Place of installation | Shandong |
| Remark | Good Performance |
| END USER | RUFENG CHEM |
| Operator: Yu, Ho Sang | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 22.10.27 | |
| Date of reporting: 22.11.03 |
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2022.10.27 (Thursday)
Operator
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement
Shandong
End User
RUFENG CHEM
Equipment Model
Equipment Model: Sigma300
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date10-27-2022
Tags
DVIA-M Series
Installation Report
RUFENG CHEM
Sigma300
Shandong
DVIA-M1000
211216R7
ZEISS
Related Case Studies

DVIA-M Series
Shanghai Institute of Space Propulsion ZEISS Sigma300 DVIA-M1000 (230701R3) Installation Report
05-15-2026Read more

DVIA-M Series
Xi'an Jiaotong University ZEISS Sigma300 SEM DVIA-M1000 (231009R3) Installation Report
12-04-2024Read more

DVIA-M Series
Xi'an Jiaotong University ZEISS Sigma 300 DVIA-M1000 (231009R3) Installation Report
07-05-2024Read more