Skip to main content
Installation Report
DVIA-M Series
10-27-2022

RUFENG CHEM Sigma300 DVIA-M1000 (211216R7) — Shandong

DVIA-M Series
Installation Report
RUFENG CHEM
Sigma300
Shandong
DVIA-M1000
211216R7
ZEISS

(M1000_ 211216R7 Set up)

Target equipmentSigma300
Place of installationShandong
RemarkGood Performance
END USERRUFENG CHEM
Operator: Yu, Ho SangDate of business trip : 17.12.27~17.12.29
Date of setup: 22.10.27
Date of reporting: 22.11.03

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2022.10.27 (Thursday)

Operator

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement

Shandong

End User

RUFENG CHEM

Equipment Model

Equipment Model: Sigma300

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-27-2022
Tags
DVIA-M Series
Installation Report
RUFENG CHEM
Sigma300
Shandong
DVIA-M1000
211216R7
ZEISS