Installation Report
DVIA-M Series
12-07-2021
YIMO Thermo Scientific Apreo 2 C MB1000 P262 (211027R2) internal program handout — 2021.12.07
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
211027R2
P262
Thermo Scientific
Apreo 2 C
Contents
(MB1000 P262 211027R2 Set up)
Target equipment
Thermo scientific – Apreo 2 C
Place of installation
N/A
Remark
Good Performance
END USER
池州西恩新材料科技有限公司
Operator
Kim, Doohyun
Date of setup
Date of setup : 21.12.07
Date of reporting
Date of reporting : 21.12.07
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.12.07 (TUE)
Operator: Daeil System, Research engineer Kim, Doohyun
Place of measurement
Place of measurement : xiamen, 池州西恩新材料科技有限公司
Equipment Model
Equipment Model: Thermo scientific – Apreo 2 C
Measurement conditions and results
Summary of measurement results
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -26 dB | -25 dB | -25 dB |
| X | -40 dB | -30 dB | -21 dB |
| Y | -35 dB | -32 dB | -25 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-07-2021
Tags
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
211027R2
P262
Thermo Scientific
Apreo 2 C
Related Case Studies

DVIA-M Series
3Trees Coatings Thermo Scientific Apreo 2C DVIA-MB1000 (210705R2) Internal Program Performance — 2021-11-29
11-29-2021Read more

DVIA-M Series
Beijing Software Testing DVIA-MB1000 Thermo Scientific Scios 2 Remote measurement — Internal program Z/X/Y plots (SN 191211R4 · P154) — 2020.08.28
08-28-2020Read more

DVIA-M Series
Zhejiang Zili Co., Ltd. Zeiss Sigma 500 DVIA-MB1000 (200715R3-1 · P186) Remote measurement — Internal program plots — 2020.08.19
08-19-2020Read more