Skip to main content
Installation Report
DVIA-M Series
10-13-2021

Sun Yat-sen University Guangzhou MB3000 P246 DVIA-MB3000 (210701R6-5) internal program — 2021.10.13

DVIA-M Series
Installation Report
Sun Yat-sen University
Guangzhou
DVIA-MB3000
MB3000 P246
210701R6-5
internal program

Worksheet

MB3000 P246(210701R6-5)

Target equipment

N/A

Place of installation

guangzhou

Remark

Good Performance

End User

Sun Yat-sen University

Operator · setup · reporting

Operator: Kim, Doohyun

Date of setup

21.10.13

Date of reporting

21.10.13

Date of business trip

17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 21.10.13 (WED)

Measurement operator

Daeil System, Research engineer Kim, Doohyun

Place of measurement

guangzhou, Sun Yat-sen University

Equipment Model

N/A

Measurement conditions and results

Summary of measurement results

Test Condition2 Hz5 Hz10 Hz
Z-23 dB-28 dB-24 dB
X-28 dB-25 dB-30 dB
Y-28 dB-40 dB-40 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-13-2021
Tags
DVIA-M Series
Installation Report
Sun Yat-sen University
Guangzhou
DVIA-MB3000
MB3000 P246
210701R6-5
internal program