Installation Report
DVIA-M Series
10-13-2021
Sun Yat-sen University Guangzhou MB3000 P246 DVIA-MB3000 (210701R6-5) internal program — 2021.10.13
DVIA-M Series
Installation Report
Sun Yat-sen University
Guangzhou
DVIA-MB3000
MB3000 P246
210701R6-5
internal program
Contents
Worksheet
MB3000 P246(210701R6-5)
Target equipment
N/A
Place of installation
guangzhou
Remark
Good Performance
End User
Sun Yat-sen University
Operator · setup · reporting
Operator: Kim, Doohyun
Date of setup
21.10.13
Date of reporting
21.10.13
Date of business trip
17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.10.13 (WED)
Measurement operator
Daeil System, Research engineer Kim, Doohyun
Place of measurement
guangzhou, Sun Yat-sen University
Equipment Model
N/A
Measurement conditions and results
Summary of measurement results
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -23 dB | -28 dB | -24 dB |
| X | -28 dB | -25 dB | -30 dB |
| Y | -28 dB | -40 dB | -40 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date10-13-2021
Tags
DVIA-M Series
Installation Report
Sun Yat-sen University
Guangzhou
DVIA-MB3000
MB3000 P246
210701R6-5
internal program
Related Case Studies

DVIA-M Series
YIMO DVIA-MB3000 (MB3000 P246, 210701R6-5) installation worksheet — 2021.09.06
09-06-2021Read more

DVIA-M Series
LG InnoTek ZEISS Xradia 620 Versa DVIA-MB3000 (201201R2) Installation Report — 2026.02.09
02-09-2026Read more

DVIA-M Series
Changping P3 Laboratory Thermo Fisher Scientific Cryo-TEM Krios G4 DVIA-MB3000 (250708R5-1) Installation Report — November 5, 2025
11-05-2025Read more