Installation Report
DVIA-M Series
05-12-2021
YIMO Thermo Fisher Scientific DVIA-MB1000 (210416R1 · MB1000 P226) Internal program worksheet — 2021.05.12
DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
MB1000
DVIA-MB1000
210416R1
P226
Contents
MB1000 P226 210416R1
Target equipment
THERMOFISHER
Place of installation
N/A
Remark
Good Performance
END USER
N/A
Operator
Operator: Choi, HyoungMun
Date of setup
Date of setup : 21.05.10
Date of reporting
Date of reporting : 21.05.12
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.05.10 (MON)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement
Place of measurement : N/A
Equipment Model
Equipment Model: THERMOFISHER
Measurement conditions and results
Summary of measurement results
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -25 dB | -30 dB | -35 dB |
| X | -32 dB | -33 dB | -35 dB |
| Y | -38 dB | -30 dB | -35 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-12-2021
Tags
DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
MB1000
DVIA-MB1000
210416R1
P226
Related Case Studies

DVIA-M Series
YIMO Ningde era Thermo Fisher Apreo 2S DVIA-MB1000 (240103R5) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Anhui University Thermo Fisher Hellos 5 UC DVIA-MB1000 (240119R4-1) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Anhui University Thermo Fisher XHR SEM Verios 5 UC DVIA-MB1000 (240119R4-2) Installation Report
05-11-2026Read more