Skip to main content
Installation Report
DVIA-M Series
05-12-2021

YIMO Thermo Fisher Scientific DVIA-MB1000 (210416R1 · MB1000 P226) Internal program worksheet — 2021.05.12

DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
MB1000
DVIA-MB1000
210416R1
P226

MB1000 P226 210416R1

Target equipment

THERMOFISHER

Place of installation

N/A

Remark

Good Performance

END USER

N/A

Operator

Operator: Choi, HyoungMun

Date of setup

Date of setup : 21.05.10

Date of reporting

Date of reporting : 21.05.12

Date of business trip

Date of business trip : 17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 21.05.10 (MON)

Operator: Daeil System, Research engineer Choi, HyoungMun

Place of measurement

Place of measurement : N/A

Equipment Model

Equipment Model: THERMOFISHER

Measurement conditions and results

Summary of measurement results

Test Condition2 Hz5 Hz10 Hz
Z-25 dB-30 dB-35 dB
X-32 dB-33 dB-35 dB
Y-38 dB-30 dB-35 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date05-12-2021
Tags
DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
MB1000
DVIA-MB1000
210416R1
P226