Installation Report
DVIA-M Series
04-28-2021
YIMO ZEISS Gemini 300 DVIA-MB1000 (201123R3) Internal Program Performance — Shenzhen — 2021.04.28
DVIA-M Series
Installation Report
YIMO
ZEISS
Gemini 300
Shenzhen
DVIA-MB1000
201123R3
Tencent
Contents
MB1000_201123R3(P210) Set up
| Target equipment | Zeiss Gemini300 |
|---|---|
| Place of installation | Shenzhen |
| Remark | Good Performance |
| END USER | Tencent |
| Operator: Munho Noh | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.04.26 | Date of reporting : 21.04.28 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.03.09 (TUE)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : Hubei
Equipment Model: Zeiss Evo 18
Measurement conditions and results
Summary of measurement results
| Transmissibility | 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|---|
| Z | -23.59 dB | -29.21 dB | -37.62 dB | |
| X | -26.75 dB | -36.25 dB | -34.58 dB | |
| Y | -22.86 dB | -27.90 dB | -43.09 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-28-2021
Tags
DVIA-M Series
Installation Report
YIMO
ZEISS
Gemini 300
Shenzhen
DVIA-MB1000
201123R3
Tencent
Related Case Studies

DVIA-M Series
YIMO Shaanxi ZEISS Sigma360 DVIA-MB1000 (240126R5) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Zeiss Technology (Suzhou) ZEISS EVO 10 DVIA-MB1000 (240304R8) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Xi'an West Test ZEISS Sigma 360 DVIA-MB1000 (240314R3) Installation Report
05-11-2026Read more