Skip to main content
Installation Report
DVIA-M Series
04-28-2021

YIMO ZEISS Gemini 300 DVIA-MB1000 (201123R3) Internal Program Performance — Shenzhen — 2021.04.28

DVIA-M Series
Installation Report
YIMO
ZEISS
Gemini 300
Shenzhen
DVIA-MB1000
201123R3
Tencent

MB1000_201123R3(P210) Set up

Target equipmentZeiss Gemini300
Place of installationShenzhen
RemarkGood Performance
END USERTencent
Operator: Munho NohDate of business trip : 17.12.27~17.12.29
Date of setup : 21.04.26Date of reporting : 21.04.28

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 21.03.09 (TUE)

Operator: Daeil System, Research engineer Munho Noh

Place of measurement : Hubei

Equipment Model: Zeiss Evo 18

Measurement conditions and results

Summary of measurement results

Transmissibility2 Hz5 Hz10 Hz
Z-23.59 dB-29.21 dB-37.62 dB
X-26.75 dB-36.25 dB-34.58 dB
Y-22.86 dB-27.90 dB-43.09 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date04-28-2021
Tags
DVIA-M Series
Installation Report
YIMO
ZEISS
Gemini 300
Shenzhen
DVIA-MB1000
201123R3
Tencent