Installation Report
DVIA-M Series
01-18-2021
YIMO Thermo Fisher DVIA-MB1000 MB1000 Internal Program Worksheet (P196 · 200925R5) — 2021.01.18
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
YIMO
Thermo Fisher
P196
200925R5
Contents
MB1000 P196 YIMO 200925R5
Target equipment
Thermo Fisher
Place of installation
N/A
Remark
Good Performance
END USER
N/A
Operator
Choi, HyoungMun
Date of setup
21.01.15
Date of reporting
21.01.18
Date of business trip
17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.01.15 (Fri)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: Thermo Fisher
Measurement conditions and results
Summary of measurement results
| Test Condition (Transmissibility) | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -22 dB | -35 dB | -30 dB |
| X | -28 dB | -30 dB | -30dB |
| Y | -28 dB | -30 dB | -30 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date01-18-2021
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
YIMO
Thermo Fisher
P196
200925R5
Related Case Studies

DVIA-M Series
Xiamen Farad Electronics Thermo Fisher Apreo 2S DVIA-M1000 MB1000 Worksheet (211206R2) — 2022-01-24
01-24-2022Read more

DVIA-M Series
ZEISS Sigma 300 DVIA-MB1000 (210503R7) YIMO internal program — 2022-01-07
01-07-2022Read more

DVIA-M Series
YIMO Thermofisher Apreo DVIA-MB1000 (211020R5) Installation Report — 2021.12.23
12-23-2021Read more