Installation Report
DVIA-M Series
08-19-2020
Zhejiang Zili Co., Ltd. Zeiss Sigma 500 DVIA-MB1000 (200715R3-1 · P186) Remote measurement — Internal program plots — 2020.08.19
DVIA-M Series
Installation Report
DVIA-MB1000
200715R3-1
Zeiss
Sigma 500
Thermo Scientific
Shaoxing
YIMO
P186
Contents
(MB1000_200715R3-1(P186) Set up)
| Target equipment | Zeiss sigma 500 |
|---|---|
| Place of installation | Shaoxing,3rd floor |
| Remark | Good Performance |
| END USER | 浙江自立股份有限公司, |
| Operator: Noh, Munho | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.08.19 | Date of reporting : 20.08.19 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.08.19 (WED),
Operator: Daeil System, Manager Munho, Noh
Place of measurement : Shaoxing,自立股份有限公司,3rd floor
Equipment Model: Thermo scientific Scios 2
Measurement conditions and results
Summary of measurement results
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -24.25 dB | -27.05 dB | -31.71 dB |
| X | -27.22 dB | -35.68 dB | -38.90 dB |
| Y | -24.92 dB | -37.14 dB | -38.4d dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date08-19-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
200715R3-1
Zeiss
Sigma 500
Thermo Scientific
Shaoxing
YIMO
P186
Related Case Studies

DVIA-M Series
Zili Co., Ltd. Zeiss Sigma 500 DVIA-MB1000 (200715R3-2 · P187) Remote measurement — Internal program plots — 2020.12.02
12-02-2020Read more

DVIA-M Series
Suzhou Weixin Electronics Zeiss Sigma 500 DVIA-MB1000 (190109R5 · P109) Remote tuning — Internal program plots — 2020.08.20
08-20-2020Read more

DVIA-M Series
YIMO Thermo Scientific Apreo 2 C MB1000 P262 (211027R2) internal program handout — 2021.12.07
12-07-2021Read more