Skip to main content
Installation Report
DVIA-M Series
08-20-2020

Suzhou Weixin Electronics Zeiss Sigma 500 DVIA-MB1000 (190109R5 · P109) Remote tuning — Internal program plots — 2020.08.20

DVIA-M Series
Installation Report
DVIA-MB1000
190109R5
Zeiss
Sigma 500
Suzhou
YIMO
Remote tuning

(MB1000_190109R5(P109) Set up)

Target equipmentZeiss sigma 500
Place of installationSuzhou, 苏州维信电子有限公司, 1st floor
RemarkGood Performance
END USERN/A
Operator: Munho NohDate of business trip : 17.12.27~17.12.29
Date of setup : 20.08.20Date of reporting : 20.08.20

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 20.08.20 (THU),

Operator: Daeil System, Research engineer Munho Noh

Place of measurement : Suzhou, 苏州维信电子有限公司, 1st floor

Equipment Model: Zeiss Sigma 500

Measurement conditions and results

Summary of measurement results

Test Condition

VC-Class

ZXY
Floor
Above Active

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date08-20-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
190109R5
Zeiss
Sigma 500
Suzhou
YIMO
Remote tuning