Installation Report
DVIA-M Series
12-15-2020
Baosteel R&D ZEISS EVO10 DVIA-MB1000 (200522R2-1 · P166) Internal program worksheet — 2020.12.15
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
200522R2-1
P166
Zeiss
EVO10
Baosteel
R&D Center
Contents
(MB1000_200522R2-1(P166) Set up)
Target equipment
ZEISS-EVO10
Place of installation
R&D Center 2Floor
Remark
Good Performance
END USER
BAOSTELL
Operator
Operator: Choi, HyoungMun
Date of setup
Date of setup : 20.12.15
Date of reporting
Date of reporting : 20.12.15
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 20.12.15 (TUE)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement
Place of measurement : R&D Center 2Floor
Equipment Model
Equipment Model: ZEISS-EVO10
Measurement conditions and results
Summary of measurement results
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -22 dB | -28 dB | -35 dB |
| X | -34 dB | -34 dB | -35dB |
| Y | -26 dB | -40dB | -35dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-15-2020
Tags
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
200522R2-1
P166
Zeiss
EVO10
Baosteel
R&D Center
Related Case Studies

DVIA-M Series
YIMO Zeiss EVO10 DVIA-MB1000 (210903R3) Internal Program Performance — 2021.11.11
11-11-2021Read more

DVIA-M Series
Xiamen Haichen Zeiss Sigma300 DVIA-MB1000 (P239 · 210820R1) Installation Report — 2021.10.12
10-12-2021Read more

DVIA-M Series
Shenzhen Yan Yi New Materials Zeiss Gemini Sigma 300 DVIA-MB1000 (200918R1 · P192) Remote measurement — Internal program plots — 2021.01.11
01-11-2021Read more