Skip to main content
Installation Report
DVIA-M Series
04-03-2020

YIMO TECH ZEISS EVO10 DVIA-MB1000 (P153) Internal program worksheet — 2020.04.03

DVIA-M Series
Installation Report
YIMO
CHINA
DVIA-MB1000
P153
Carl Zeiss
EVO10
ZEISS - EVO10

CHINA YIMO_TECH

(MB1000_ P153)

Target equipment

ZEISS - EVO10

Place of installation

F2

Remark

Good Performance

END USER

N/A

Operator

Operator: Choi, Hyoung Mun

Date of setup

Date of setup : 20.04.03

Date of reporting

Date of reporting : 20.04.06

Date of business trip

Date of business trip : 17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 2020.04.03 (FRI),

Operator: Daeil System, Manager Choi, Hyoung Mun

Place of measurement

Place of measurement : F2

Equipment Model

Equipment Model: ZEISS - EVO10

Measurement conditions and results

Summary of measurement results

Test ConditionZXY
VC-Class
Floor
Above Active

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date04-03-2020
Tags
DVIA-M Series
Installation Report
YIMO
CHINA
DVIA-MB1000
P153
Carl Zeiss
EVO10
ZEISS - EVO10