Installation Report
DVIA-M Series
04-03-2020
YIMO TECH ZEISS EVO10 DVIA-MB1000 (P153) Internal program worksheet — 2020.04.03
DVIA-M Series
Installation Report
YIMO
CHINA
DVIA-MB1000
P153
Carl Zeiss
EVO10
ZEISS - EVO10
Contents
CHINA YIMO_TECH
(MB1000_ P153)
Target equipment
ZEISS - EVO10
Place of installation
F2
Remark
Good Performance
END USER
N/A
Operator
Operator: Choi, Hyoung Mun
Date of setup
Date of setup : 20.04.03
Date of reporting
Date of reporting : 20.04.06
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 2020.04.03 (FRI),
Operator: Daeil System, Manager Choi, Hyoung Mun
Place of measurement
Place of measurement : F2
Equipment Model
Equipment Model: ZEISS - EVO10
Measurement conditions and results
Summary of measurement results
| Test Condition | Z | X | Y |
|---|---|---|---|
| VC-Class | |||
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-03-2020
Tags
DVIA-M Series
Installation Report
YIMO
CHINA
DVIA-MB1000
P153
Carl Zeiss
EVO10
ZEISS - EVO10
Related Case Studies

DVIA-M Series
YIMO Zeiss EVO10 DVIA-MB1000 (210903R3) Internal Program Performance — 2021.11.11
11-11-2021Read more

DVIA-M Series
Baosteel R&D ZEISS EVO10 DVIA-MB1000 (200522R2-1 · P166) Internal program worksheet — 2020.12.15
12-15-2020Read more

DVIA-M Series
Jinhae Armed Forces Financial Management Command ZEISS FE-SEM EVO10 DVIA-MB1000 (230704R4) Installation Report
05-15-2026Read more