Skip to main content
Installation Report
DVIA-M Series
09-10-2019

Wenzhou Hongfeng Electric Alloy Hitachi SU1510 MB1000 (P141) China trip installation report — 2019

DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P141
Hitachi
SEM
SU1510
Wenzhou
China

China business trip report (MB1000_P141 Set up)

Set-up photograph

Target equipment and site

Target equipmentHitachi SU1510
Installation siteF3, Wenzhou Hongfeng electric alloy
RemarksGood Performance
END USERWenzhou Hongfeng electric alloy

Engineer and dates

출장자 : 최성원

출장일 : 19.09.05

작성일 : 19.09.10

Installation result summary

Vibration levels

Test DirectionAxisBaseTop
ACTIVEZCF
XCF
YCF

Omnidirectional performance is satisfactory.

Performance of the vibration isolation platform is satisfactory, yet image resolution is not fully realized.

MB1000 internal program performance measurement results

Z axis - MB1000 internal program

X axis - MB1000 internal program

Y axis - MB1000 internal program

Vibration environment measurement results

Z axis - vibration environment measurement

X axis - vibration environment measurement

Y axis - vibration environment measurement

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-10-2019
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P141
Hitachi
SEM
SU1510
Wenzhou
China