Installation Report
DVIA-M Series
04-10-2018
Pudan Univ BRUKER 400WB NMR DVIA-MB1000 (MC1000 P73) internal program & octave-band — 2018.04.10
DVIA-M Series
DVIA-MB1000
MC1000
BRUKER
NMR
Installation Report
Pudan Univ
P73
2018
Contents
Pudan Univ (MC1000_P73 Set up)
Target equipment
BRUKER 400WB NMR
Place of installation
Pudan UNIV, Basement 1FLOOR
Uniqueness
Good Performance
END USER
Pudan Univ
Date of business trip
18.03.30
Business traveler
Choi, HyoungMun
Date Created
18.04.10
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
2018.03.30 (Friday), Rater: Daeil System, Manager Choi , Hyoung Moon
Place of measurement
Pudan UNIV, Basement 1FLOOR
Equipment Model
BRUKER 400WB NMR
Measurement conditions and results
Summary of measurement results
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | E | E | F |
| Above Active | G | G | G |
Good omnidirectional performance and attached VC-Class graph.
MB1000 internal program performance measurement result
VC-Class graph — Z axis
VC-Class graph — X axis
VC-Class graph — Y axis
Octave Band Result (BASE: Floor, TOP: Above Active)
Octave band — Z axis
Octave band — X axis
Octave band — Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-10-2018
Tags
DVIA-M Series
DVIA-MB1000
MC1000
BRUKER
NMR
Installation Report
Pudan Univ
P73
2018
Related Case Studies

DVIA-M Series
BRUKER 400WB NMR MC1000/P73 — DVIA-M Series vibration report (2018-04-10)
04-10-2018Read more

DVIA-M Series
OXFORD AS400 NMR DVIA-MB1000/P75 (MC1000_P75) — DVIA-M Series vibration report (2018-04-10)
04-10-2018Read more

DVIA-M Series
Fudan University BRUKER ULTRA SHIELD 500 NMR MC1000/P76 — DVIA-M Series performance report (2018-04-10)
04-10-2018Read more