Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

Filtered Case Studies

200 case studies
Little Swan UB1000 P6 China Business Trip Report — Zeiss EVO 18 SEM (2018-05-10)

UB1000_P6 setup business trip report for Zeiss EVO 18 SEM at Little Swan. Trip date 2018.05.10; report written 2018.05.14; engineer CHOI SUNG WON. VC-Class summary table (ACTIVE Base Z C / Top E; X and Y E/E), installation results narrative, internal-program Z/X/Y ACTIVE transmissibility plots, and floor vibration-environment Z/X/Y 1/3-octave plots. Decorative header PNG omitted.

Tier-1 Semiconductor Bruker VERTEX 80 DVIA-U1000 (UO1000_P5) Installation Report — Seoul

DVIA-U1000 compact worksheet UO1000_P5 for Bruker VERTEX 80 at Tier-1 Semiconductor (Seoul Samsung Hospital B4 animal laboratory). Business trip and report written 18.02.06; operator Hyungmoon Choi. VC-Class summary table (building floor vs isolator top plate) and follow-up notes per the form; MB1000 internal-program and octave-band (floor vs isolator top) Z/X/Y screenshots per §2a embed mapping. Decorative header bitmap (image1) omitted.

Saeron Technology UB1000 P3 demo result — in-house SEM vibration survey (2016-10-21)

Demo report dated 21 October 2016 for UB1000 P3 at Saeron Technology in Uiwang, Gyeonggi-do, comparing on-site vibration and 100,000× SEM imaging against the existing MB1000 platform on an in-house SEM. Travelers CHOI HYOUNGMUN and LIM JONG UK; measurer LIM JONG UK. Publication includes the in-house SEM photograph, floor versus platform VC-class Z/X/Y plots, and ACTIVE image-comparison captures for MB1000 and UB1000. Decorative header PNG omitted.

DVIA-U type (UB1000) Installation Test Report — Reporting 2016.09.02

Archived DVIA-U type UB1000 installation test summary (installation and measurement 2016.08.31; reporting 2016.09.02; engineer LIM JONG UK, DAEIL SYSTEMS). Source worksheet lists VC-class results for active Z/X/Y on base and top and includes internal-program transmissibility plots (Result 1) plus PULSE 1/3 octave band plots (Result 2). No customer or installation site is named in the worksheet.

UB1000 P2 Chengdu China Business Trip Report — Zeiss EVO 18 SEM (2016-09-02)

UB1000_P2 setup business trip to Chengdu, China (30 Aug–1 Sep 2016) for Zeiss EVO 18 SEM. Engineers CHOI HYOUNGMUN and LIM JONG UK; report written 2016-09-02. Publication includes the equipment setup photograph, passive spring comparison diagram, internal-program Z (PASSIVE/ACTIVE) and X/Y ACTIVE plots, floor vibration-environment Z/X/Y plots, and SEM ON/OFF comparison plots (OFF captures only; ON reuses ACTIVE transmissibility plots from Attachment 1). Decorative header PNG omitted.

Korea Institute of Ocean Science & Technology UD350 DVIA-UD350 Setup Result Report

2016 DVIA-UD350 setup report for Korea Institute of Ocean Science & Technology: ACTIVE-state VC-Class summary table (ship environment), excursion notes referencing three attachment groups, plus internal-program screenshots, vibration-environment plots, and floor time-axis graphs (Z/X/Y). Decorative DOCX title-block image (image1) omitted from publication.