Installation Report
DVIA-ULF Series
05-04-2021
Institute for Basic Science Main Building Ultrasonic Equipment DVIA-UD350 P28 Pulse Worksheet Installation Report
DVIA-UD Series
Installation Report
Institute for Basic Science
DVIA-UD350
Pulse
Ultrasonic equipment
P28
Contents
Institute for Basic Science (UD350 P28)
Site checklist
| Target equipment | 초음파 장비 |
|---|---|
| Place of installation | 기초과학연구원 본관2층 |
| Remark | Good Performance |
| END USER | 기초과학연구원 |
Operator and dates
| Operator: Choi, Hyoung Mun Date of setup : 21.05.03 Date of reporting : 20.05.04 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.05.03 (MON),
Operator: Daeil System, Manager Choi, Hyoung Mun
Place of measurement : 기초과학연구원 본관2층
Equipment Model: 초음파장비
Measurement conditions and results
DAQ System : B&K PULSE 14 & LAN-XI Type 3056
Accelerometer : PCB PIEZOTRONICS 393B05
Frequency Range : 0.7 ~ 200Hz
Summary of measurement results
Good omnidirectional performance.
Measurement summary (VC-Class)
| Test Condition | VC-Class |
|---|---|
| Z | |
| Floor | D |
| Above Active | G |
UD350 internal program performance measurement result
Z axis (internal program)
X axis (internal program)
Y axis (internal program)
Octave Band Result (BASE: Floor, TOP: Above Active)
Z axis (octave band)
X axis (octave band)
Y axis (octave band)
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date05-04-2021
Tags
DVIA-UD Series
Installation Report
Institute for Basic Science
DVIA-UD350
Pulse
Ultrasonic equipment
P28
Related Case Studies

DVIA-ULF Series
Institute for Basic Science Main Building Ultrasonic Equipment DVIA-UD350 P29 Pulse Worksheet Installation Report
05-04-2021Read more

DVIA-ULF Series
Institute for Basic Science 2F Analysis Lab DVIA-UD350 P16 Installation Report
12-05-2019Read more

DVIA-ULF Series
Institute for Basic Science 2F Analysis Lab NIKON ECLIPSE DVIA-UD350 P9 Installation Report
12-05-2019Read more