Xiamen Street Lighting Institute Thermo Fisher Scientific Talos DVIA-M-THT3 (240807R5) Internal Program Performance — 2024.12.05
DVIA-M Series
Installation Report
Xiamen Street Lighting Institute
Thermo Fisher Scientific
Talos
TEM
Xiamen
DVIA-M-THT3
240807R5
Contents
(M-THT3_ 240807R5 Set-up)
| Target equipment | Thermo Fisher Scientific Talos |
|---|---|
| Place of installation | Xiamen |
| Remark | Good Performance |
| END USER | Xiamen Street Lighting Institute |
| Operator: Chaewon Lee | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 24.12.05 | Date of reporting: 24.12.05 |
Overview
The DVIA-M-THT3 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2024.12.05(Thursday)
Operator
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement
Xiamen
Equipment Model
Manufacturer: Thermo Fisher Scientific
Equipment: TEM
Model: Talos
M-THT3 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-05-2024
Tags
DVIA-M Series
Installation Report
Xiamen Street Lighting Institute
Thermo Fisher Scientific
Talos
TEM
Xiamen
DVIA-M-THT3
240807R5
Related Case Studies

DVIA-M Series
Xiamen Thermo Fisher Talos DVIA-M-THT3 (240807R5) Installation Report
11-18-2024Read more

DVIA-M Series
Zhejiang University Ningbo Thermo Fisher Scientific Talos TEM DVIA-M-THT3 (2405090R7-1) Installation Report
09-10-2024Read more

DVIA-M Series
Northeastern University Shenyang Thermo Fisher Scientific Talos TEM DVIA-M-THT3 (231129R2-2) Installation Report
07-05-2024Read more