Installation Report
DVIA-M Series
07-05-2024
Northeastern University Shenyang Thermo Fisher Scientific Talos TEM DVIA-M-THT3 (231129R2-2) Installation Report
DVIA-M Series
Installation Report
Thermo Fisher Scientific
Talos
TEM
DVIA-M-THT3
231129R2-2
Shenyang
Northeastern University
Contents
Northeastern University
Northeastern University
(M-THT3\_ 231129R2-2 Set-up)
Report summary
| Target equipment | Thermo Fisher Scientific |
|---|---|
| Place of installation | Shenyang |
| Remark | Good Performance |
| END USER | Northeastern University |
Operator and dates
Operator: Chaewon Lee
Date of setup: 24.04.30
Date of reporting: 24.07.05
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M-THT3 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.04.30(Tuesday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: Shenyang
Equipment Model:
Manufacturer: Thermo Fisher Scientific
Equipment: TEM
Model: Talos
5.
M-THT3 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
Thermo Fisher Scientific
Talos
TEM
DVIA-M-THT3
231129R2-2
Shenyang
Northeastern University
Related Case Studies

DVIA-M Series
Xiamen Street Lighting Institute Thermo Fisher Scientific Talos DVIA-M-THT3 (240807R5) Internal Program Performance — 2024.12.05
12-05-2024Read more

DVIA-M Series
Xiamen Thermo Fisher Talos DVIA-M-THT3 (240807R5) Installation Report
11-18-2024Read more

DVIA-M Series
Zhejiang University Ningbo Thermo Fisher Scientific Talos TEM DVIA-M-THT3 (2405090R7-1) Installation Report
09-10-2024Read more