Installation Report
DVIA-M Series
09-20-2024
HITACHI SU8600 DVIA-M1000 (231219R3-3) Installation Report — Wuxi
DVIA-M Series
Installation Report
Huahong
HITACHI
SU8600
Wuxi
DVIA-M1000
231219R3-3
Contents
Huahong
Huahong
(M1000_ 231219R3-3 Set up)
Site checklist
| Target equipment | HITACHI SU8600 |
|---|---|
| Place of installation | Wuxi |
| Remark | Good Performance |
| END USER | Huahong |
Operator and dates
Operator: Lee, Chaewon
Date of setup: 24.09.20
Date of reporting: 24.11.14
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.09.20 (Friday)
Operator: DAEIL SYSTEMS Chaewon Lee
Place of measurement: Wuxi
Equipment Model:
Manufacturer: HITACHI
Equipment: FE-SEM
Model: SU8600
5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-20-2024
Tags
DVIA-M Series
Installation Report
Huahong
HITACHI
SU8600
Wuxi
DVIA-M1000
231219R3-3
Related Case Studies

DVIA-M Series
Huahong Hitachi SU8600 FE-SEM DVIA-M1000 (231219R3-2) Installation Report
09-20-2024Read more

DVIA-M Series
YIMO HITACHI FE-SEM SU8600 DVIA-M1000 (240828R1-5) Installation Report
11-18-2024Read more

DVIA-M Series
Huangshan University HITACHI FE-SEM SU8600 DVIA-M1000 (230501R1) Installation Report
01-04-2024Read more