Installation Report
DVIA-M Series
07-03-2024
Shanghai Institute of Ceramics (CAS) Thermo Fisher Spectra 300 — DVIA-MB3000 (231004R3-2) Worksheet — 2024.07.03
DVIA-M Series
Installation Report
SICCAS
Thermo Fisher
Spectra 300
DVIA-MB3000
231004R3-2
Contents
Worksheet
(MB3000_ 231004R3-2 Set up)
Target equipment: Thermo Fisher Spectra 300
Place of installation: 上海市
Remark: Good Performance
End User: 硅酸盐所
Operator · setup · reporting
Operator: Byeonghun Cho Date of setup: 24.07.03 Date of reporting: 24.07.05
Date of business trip
17.12.27~17.12.29
Overview
The DVIA-MB3000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2024.07.03 (Wednesday)
Engineer
Byeonghun Cho from DAEIL SYSTEMS
Place of measurement
上海市
Equipment Model
Thermo Fisher Spectra 300
M3000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-03-2024
Tags
DVIA-M Series
Installation Report
SICCAS
Thermo Fisher
Spectra 300
DVIA-MB3000
231004R3-2
Related Case Studies

DVIA-M Series
Thermo Fisher Spectra 300 S/TEM DVIA-MB3000 (240415R3-2) — Shenzhen Weiguang, 2024-07-26
08-07-2024Read more

DVIA-M Series
Thermo Fisher Spectra 300 S/TEM DVIA-MB3000 (240415R3-1) — Shenzhen Weiguang, 2024-05-30
07-05-2024Read more

DVIA-M Series
Thermo Fisher Spectra 300 TEM DVIA-MB3000 (240415R3-2) — Shenzhen Weiguang, 2024-06-13
07-05-2024Read more