Installation Report
DVIA-M Series
05-28-2024

ZEISS Sigma360 SEM DVIA-M1000 (230926R1) Installation Report — Changsha

DVIA-M Series
Installation Report
ZEISS
SEM
Sigma 360
Changsha
DVIA-M1000
230926R1

Overview

Target equipment

ZEISS Sigma360

Place of installation

Changsha

Remark

Good Performance

END USER

Time core material

Operator

Chaewon Lee

Date of setup

24.03.22

Date of reporting

24.07.05

Date of business trip

17.12.27~17.12.29

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2024.05.28(Tuesday)

Operator

Chaewon Lee from DAEIL SYSTEMS

Place of measurement

Time core material

Equipment Model

Manufacturer

ZEISS

Equipment

SEM

Model

Sigma360

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date05-28-2024
Tags
DVIA-M Series
Installation Report
ZEISS
SEM
Sigma 360
Changsha
DVIA-M1000
230926R1