Skip to main content
Installation Report
DVIA-M Series
09-19-2024

Westlake University Thermo Fisher Helios 5 Hydra DVIA-M1000 (230908R3-2) Installation Report — 2024.09.19

DVIA-M Series
Installation Report
Westlake University
Thermo Fisher Scientific
Helios 5 Hydra
DVIA-M1000
230908R3-2

Westlake University

(M1000_ 230908R3-2 Set-up)

Target equipmentThermo Fisher Helios 5 Hydra
Place of installation杭州市
RemarkGood Performance
END USERWestlake University

Operator: Chaewon Lee

Date of setup: 24.09.19

Date of reporting: 24.09.23

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2024.09.19 (Thursday)

Operator

Chaewon Lee from DAEIL SYSTEMS

Place of measurement

杭州市

Equipment Model

Thermo Fisher Helios 5 Hydra

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-19-2024
Tags
DVIA-M Series
Installation Report
Westlake University
Thermo Fisher Scientific
Helios 5 Hydra
DVIA-M1000
230908R3-2