Installation Report
DVIA-M Series
12-13-2023
Tianjin University Thermo Fisher ESEM Quattro110 DVIA-M1000 (230908R3-1) Installation Report — 2023.12.13
DVIA-M Series
Installation Report
Tianjin University
Thermo Fisher Scientific
ESEM
Quattro110
DVIA-M1000
230908R3-1
Contents
Tianjin University
(M1000_ 230908R3-1 Set up)
| Target equipment | Quattro110 |
|---|---|
| Place of installation | Tianjin |
| Remark | Good Performance |
| END USER | Tianjin University |
Operator: Park, Jongwon
Date of setup: 23.12.13
Date of reporting: 23.12.13
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2023.12.13 (Wednesday)
Operator
DAEIL SYSTEMS Jongwon Park
Place of measurement
Tianjin
Equipment Model
Thermo Fisher Scientific ESEM Quattro110
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-13-2023
Tags
DVIA-M Series
Installation Report
Tianjin University
Thermo Fisher Scientific
ESEM
Quattro110
DVIA-M1000
230908R3-1
Related Case Studies

DVIA-M Series
Peking University Shenzhen Graduate School Thermo Fisher Helios 5 CX FIB-SEM DVIA-M1000 (250613R3) Installation Report
11-11-2025Read more
DVIA-M Series
Chinese Academy of Sciences Institute of Semiconductors Thermo Fisher Helios 5 CX DVIA-M1000 (250619R4) Installation Report
09-01-2025Read more

DVIA-M Series
Hangzhou Thermo Fisher Helios 5 CX FIB-SEM DVIA-M1000 (250417R2) Installation Report
06-09-2025Read more