Skip to main content
Installation Report
DVIA-M Series
07-05-2024

ZEISS Crossbeam 550 DVIA-M1000 (230522R2) Installation Report

DVIA-M Series
Installation Report
ZEISS
Crossbeam 550
FIB-SEM
DVIA-M1000
230522R2

(M1000_ 230522R2 Set-up)

Site checklist

Target equipmentZEISS Crossbeam550
Place of installationN/A
RemarkGood Performance
END USERN/A

Operator and dates

Operator: Chaewon Lee

Date of setup: 23.08.16

Date of reporting: 24.07.05

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.08.16(Wednesday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: N/A

Equipment Model:

Manufacturer: ZEISS

Equipment: FIB-SEM

Model: Crossbeam550

5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
ZEISS
Crossbeam 550
FIB-SEM
DVIA-M1000
230522R2