Installation Report
DVIA-M Series
05-15-2026
TESCAN MAGNA GMH DVIA-M1000 (230501R2) Installation Report — Kunshan
DVIA-M Series
Installation Report
NCS Testing Technology
TESCAN
MAGNA GMH
DVIA-M1000
230501R2
Kunshan
Contents
Installation information
Target equipment: TESCAN MAGNA GMH
Place of installation: KUNSHAN
Remark: Good Performance
END USER: NCS Testing Technology CO.,LTD
Operator and schedule
Operator: Lee, Young Ha
Date of setup: 23.07.18
Date of reporting: 23.07.19
Date of business trip: 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.07.18 (Tuesday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: KUNSHAN
Equipment Model: TESCAN MAGNA GMH
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-15-2026
Tags
DVIA-M Series
Installation Report
NCS Testing Technology
TESCAN
MAGNA GMH
DVIA-M1000
230501R2
Kunshan
Related Case Studies

DVIA-M Series
TESCAN SOLARIS GMH DVIA-M1000 (230501R3-1) Installation Report
05-15-2026Read more

DVIA-M Series
TESCAN SEM MAGNA DVIA-M1000 (230908R2-1) Installation Report
05-15-2026Read more

DVIA-M Series
TESCAN Plasma FIB-SEM AMBER X GMH DVIA-M1000 (231016R1) Installation Summary — Bengbu
11-06-2024Read more