Installation Report
DVIA-M Series
05-15-2026

TESCAN MAGNA GMH DVIA-M1000 (230501R2) Installation Report — Kunshan

DVIA-M Series
Installation Report
NCS Testing Technology
TESCAN
MAGNA GMH
DVIA-M1000
230501R2
Kunshan

Installation information

Target equipment: TESCAN MAGNA GMH

Place of installation: KUNSHAN

Remark: Good Performance

END USER: NCS Testing Technology CO.,LTD

Operator and schedule

Operator: Lee, Young Ha

Date of setup: 23.07.18

Date of reporting: 23.07.19

Date of business trip: 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.07.18 (Tuesday)

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: KUNSHAN

Equipment Model: TESCAN MAGNA GMH

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date05-15-2026
Tags
DVIA-M Series
Installation Report
NCS Testing Technology
TESCAN
MAGNA GMH
DVIA-M1000
230501R2
Kunshan