Installation Report
DVIA-M Series
09-18-2023
Southwest Jiaotong University SEM5000 DVIA-M1000 (230209R2) Installation Report
DVIA-M Series
Installation Report
Southwest Jiaotong University
DVIA-M1000
230209R2
SEM5000
Chengdu
Contents
Southwest Jiaotong University
Southwest Jiaotong University
(M1000_ 230209R2 Set up)
Site checklist
| Target equipment | SEM5000 |
|---|---|
| Place of installation | Chengdu |
| Remark | Good Performance |
| END USER | Southwest Jiaotong University |
Operator and dates
Operator: Park, Jongwon
Date of setup: 23.09.18
Date of reporting: 23.09.18
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.09.18 (Monday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Chengdu
Equipment Model: SEM5000
5.
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-18-2023
Tags
DVIA-M Series
Installation Report
Southwest Jiaotong University
DVIA-M1000
230209R2
SEM5000
Chengdu
Related Case Studies

DVIA-M Series
YIMO BYD Semiconductor ZEISS Crossbeam 550 FIB-SEM DVIA-M1000 (240314R6) Installation Report
05-11-2026Read more

DVIA-M Series
Chengdu BYD Semiconductor ZEISS GeminiSEM 360 DVIA-M1000 (231204R5) Internal Program Performance — 2024.07.12
07-12-2024Read more
DVIA-M Series
Tier-1 Semiconductor Chengdu ZEISS GeminiSEM 360 DVIA-M1000 (231204R6) Installation Report — 2024.07.12
07-12-2024Read more