Skip to main content
Installation Report
DVIA-P Series
02-15-2023

Shenzhen Optiark EBPG5200 DVIA-P4000 (221212R1) Installation Report — GUANGDONG — 2023.02.15

DVIA-P Series
Installation Report
Shenzhen Optiark
EBPG5200
GUANGDONG
DVIA-P4000
221212R1

Shenzhen Optiark Semiconductor Technologies Co., Ltd.

(P4000_221212R1 Set up)

Equipment photo

Target equipment and site

Target equipmentEBPG5200
Place of installationGUANGDONG
RemarkGood Performance
END USEREBPG5200

Report details

Operator: Yu, Ho sang<br>Date of setup: 23.02.15<br>Date of reporting: 23.02.21Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-P4000 active vibration isolation platform is appropriately installed and functioning as intended. (prior to equipment installation).

Measurement date

2023.02.15 (Wedday)

Operator

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement

GUANGDONG

Equipment Model

EBPG5200

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-P Series
Date02-15-2023
Tags
DVIA-P Series
Installation Report
Shenzhen Optiark
EBPG5200
GUANGDONG
DVIA-P4000
221212R1